Build a dated cash schedule

Start with accessible cash and add receipts when they are expected to clear. Deduct payments when they become due, including deposits, loan payments, construction invoices, and retained operating funds. Show restricted accounts separately. Committed debt is not cash until draw conditions are satisfied. A property valuation is not a receipt. Keep the forecast connected to current commitments so changes in delivery or reimbursement dates affect the balance automatically.

A fictional reimbursement mismatch

In a fictional project, the contractor's payment date arrives before the lender completes its draw inspection. The overall sources-and-uses schedule balances, and the stabilized valuation exceeds projected cost. Neither fact pays the invoice. The sponsor identifies the temporary deficit and reviews available, authorized funding before approving more work. The decision is to arrange a documented timing solution or adjust the work sequence by agreement, rather than assume the lender will accelerate its procedures on request.

Protect operating continuity

Test delayed receipts, unplanned repairs, and the transition from construction into leasing. Identify the lowest accessible cash position and the actions required before it becomes negative. Do not treat restricted reserves as freely transferable or assume owners will meet an unagreed capital call. A liquidity buffer needs a stated purpose and replenishment plan. This schedule does not prove long-term profitability, but it shows whether the proposed path can be funded. Sensitivity analysis should then test the assumptions that most affect the timing and depth of the cash need.

Take the next step

Read the next analysis

General information—not personalized legal, tax, investment, engineering or architectural advice.